Monday 8 June 2009

I was in the pool!!!

Our level size has taken a dip in a cold pool. It has shrunk. I've been working almost 'round the clock since interfaces. I started putting some pipes and stuff in there...I wasn't feeling it. I've redesigned the hallways (including the grand), security room, elevator locations, electric tunnels, steam tunnels, as well as relocating the docking bay and lower levels (relocation thru shrinkage mostly). I will post some screen shots later.

No comments:

Post a Comment